national

The utmost readiness to face the dangers of autumn rain

oussama

Local authorities across the country to take a number of pre -emptive measures and readiness to avoid sudden floods and seasonal rains, to raise readiness and prepare for any emergency, by updating the black points of water drainage networks and inventory of human resources designated for disaster management.

In implementation of what was stated in the two ministries No. 743/2023 and 488/2024 related to the preparation for the fall and winter season and the prevention of the risks of weather fluctuations, the governor of Bashar chaired a evaluation meeting centered on the evaluation of the hygiene process for the city The roads, as well as update the data of the preventive plan for the risk of floods and weather fluctuations that include the follow -up of the hygiene file through, firstly the daily follow -up of the process of lifting household waste and secondly weekly campaigns for hygiene, cleaning sewage channels, drains and channels on the edge of the roads, counting all areas at risk of floods and taking all preventive measures.

In the same context, the governor assumed strict instructions that the process should be continued and to harness all material and human means at the level of all municipalities of the state.

Within the framework of pre -emptive procedures and preparation for sudden floods and seasonal rains, the Director of Civil Protection of Tizi -Ouzou state gave a number of recommendations and directives, and this is to raise readiness and prepare for any emergency for rescue and relief operations.

During its presidency of the work of the executive council of the state, which was devoted to the extent of following up the extent of the implementation of the instructions emanating from the Executive Council meeting held on July 30, 2025 and preparing for the autumn and winter seasons, the governor of Boumerdes Province stressed the need to provide accurate clarifications regarding practical measures taken by local officials and executives, to ensure the shortcomings presented in development projects, especially Educational ones, stressing the importance of enhancing coordination between various interests to accelerate the pace of completion, in addition to ensuring the settlement of serious and committed contracting dues, and taking appropriate measures in unjustified delay cases.

In this context, the main axis of the meeting was devoted to pre -preparation for the coming autumn and winter seasons, and pre -emptive measures related to facing weather fluctuations, especially the danger of floods, sewage blockage, and soil erosion, as the Director of Public Works and the Director of Water Resources presented two comprehensive technical shows that included the general situation of current preparations, human and material means, as well as completed works until today With regard to road cleaning, valleys purification, sewage intensification, and re -create black points at the level of roads and waterways.

The ongoing works of the completion and maintenance of sewage channels and the preparation of valleys and secondary sewers were also reviewed, in addition to programmed projects to improve the effectiveness of networks and avoid bottlenecks in climatic peak times.

In conclusion, the governor stressed the importance of continuing the operations of raising black points and purifying the edges and sewers, with the launch of coordinated awareness campaigns in which all the concerned sectors, including public works interests, water resources, the Algerian water, the National cleansing Bureau, the Madinat and Municipal Foundation, with the aim of ensuring the maximum readiness to immediate intervention when necessary, and reduce the potential risks during the upcoming air fluctuations.

According to the solutions of the fall season and to prevent the effects of weather fluctuations with him, the state authorities for the state of Ostrich ordered the heads of departments and municipalities, the relevant managers each in its concern, by carrying out pre -emptive arrangements to avoid any accidents, especially by launching weekly cleaning campaigns for cities to eliminate all black points and random levers of waste, purification, purification The drains, sewage channels and channels on the edges of the roads, cleaning the valleys and removing weeds and dust, with the need to involve civil society activities in this process and join all efforts for the sake of their success.

Finally, the need to coordinate between the various bodies involved in the mentioned files and the serious follow -up to them in order to achieve the ruler goals.

#utmost #readiness #face #dangers #autumn #rain




#oussama_boulegheb #elhiwardz #alakhibariat.xyz #elhiwar #elhiwar-en

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

يجي اقاف حظر إعلانك

يجي اقاف حظر إعلانك وشكرا